top of page
  • Facebook
  • LinkedIn
  • TikTok

KARTLEGGINGSSKJEMA

PROJECT/CONTACT INFORMATION

STATUS OF PROJECT

Feasibility study:
Yes
No
Public tender:
Yes
No
Construction of new HPP:
Yes
No
Modernisation of existing plant:
Yes
No

TECHNICAL DATA - FOR EACH INTAKE

SCREENING DISPOSAL

Conveyor:
Yes
No
Or wash-out channel:
Yes
No
Or container:
Yes
No
Open for suggestions/advice:
Yes
No
Ice-formation between bars to be removed:
Yes
No
Are they all of same size? Do all screens have same inclination (A)?
Yes
No

Our normal gauge is 1.5m, but we have even supplied with 1.2m gauge. Our elevated monorail is less than 1m. The elevated monorail is for Loke (small) and Odin (medium)

Note: the technical information is required for ALL intakes, if they are different.

Site visit mandatory:
Yes
No
Site visit possible:
Yes
No
Budgetary quotation required:
Yes
No
Formal offer required:
Yes
No
Silt/sedimentation issues:
Yes
No
If so, type of sediments (typical size and weight):
No
Mud
Gravel
Silt
Rocks
Interest in hybrid solution – trash rack cleaner and sediment remover?
Yes
No

Copyright 2025 Enerquip | Alle rettigheter forbeholdt

bottom of page